联系方式

  • QQ:99515681
  • 邮箱:99515681@qq.com
  • 工作时间:8:00-23:00
  • 微信:codinghelp

您当前位置:首页 >> CS作业CS作业

日期:2024-05-09 06:47

ISE 563 Homework 4

Due Date: May 4th, 2024

Exercise 4.1.

Estimate the GARCH(1,1) parameters for the daily stock data in the attached excel file.

What are the GARCH parameters and the forecasted volatilities 30, 365, and 730 days into the future?

What are the parameters if the errors are t-distributed with f degrees of freedom?

Exercise 4.2

Given the following portfolio

•  One unit of stock S with initial value $100

•  $100 in a money market (MM) risk-free account (Risk-free)

•  One 3-year Put option on S with strike of $80.

Other assumptions

Risk free rate term structure of 3% flat

o Risk-free rate follows a Vasicek process with a=0.10, b=0.03, and sigma = 0.01. Term structure flat at the risk-free level

•  Stock Real World (RW) growth rate of 8%

•  Stock RW volatility of 17%

•  Implied volatility of 20%, flat term structure and no skew

•  30% correlation  between stock return and change in risk- free rates

Simulate 100 (or more) RW scenarios using 12 monthly steps and calculate the following.

a) What   is  the   mean,   median,  std  dev,  VaR   (90%),  and Expected Shortfall (90%) of this portfolio in 1 year?

b) What  is  the  mean,  median,  std  dev,  VaR,  and  Expected Shortfall of the same portfolio if you rebalance the Stock and MM to the 50%/50% weights each month?

Exercise 4.3

Given monthly US Treasury rates in the Excel file.

•  Calculate the PCAs using monthly changes for the following specifications

o Simple differences:  [x(t) – x(t-1)]

o Log differences:   ln[x(t) / x(t-1)]

o Displaced log differences: ln[(x(t)+2%) / (x(t-1)+2%)]

•  What percent of the variation is accounted for by the first 3 Principal Components?

•  What would be a 2-standard deviation confidence interval for the first Principal Component over a 1-month horizon? A 12-month horizon?

•  Redo  using  annual  changes  and  compare your  12-month confidence intervals?

Exercise 4.4

Use a 3-step trinomial tree to value the following real option to either expand protection or abandon a project. The underlying commodity is C with the initial value of 20 and a risk-free rate of 4%. The risk neutral process for C is:

C/dC = [θ(t) 0. 1 ln(s)]dt + 0.2dz

The future prices for years 1, 2, and 3 are $21, $22, and $23. Cashflows are based on C are received in years 1, 2, and 3. The profit for each unit is given by:

Profit = 1.2*C - 25

.  What is the value of the profits with no optionality?

.  What is the value of the project if you can abandon at times 1 and 2 for $5?

.  What is the value of the profits if you can double production at time 2 for $10?





版权所有:留学生编程辅导网 2020 All Rights Reserved 联系方式:QQ:99515681 微信:codinghelp 电子信箱:99515681@qq.com
免责声明:本站部分内容从网络整理而来,只供参考!如有版权问题可联系本站删除。 站长地图

python代写
微信客服:codinghelp