联系方式

  • QQ:99515681
  • 邮箱:99515681@qq.com
  • 工作时间:8:00-23:00
  • 微信:codinghelp

您当前位置:首页 >> Java编程Java编程

日期:2019-03-09 10:53

2. Problem 1084

Title: Highway Lite

Description

Note: this is a simplified version of "Highway"

=Overview=

In this problem you are asked to implement a simplistic highway simulation. The 'highway' is (rows x cols) grid of cells that can

be occupied by a vehicle or not. All traffic starts at the left side of of the grid (at column 0) and travels right on, never switching

lane (i.e., row). If a car moves beyond the last column it exits the simulation. As input you will be given a list of arrival times of

vehicles, the goal is to produce the state of the highway after a specified number of simulation steps.

=The Highway=

The highway is a (rows x cols) grid, where row 0 corresponds to the topmost lane, and column 0 is the leftmost segment. I.e., a 3

lane highway of 10 segments looks like this:

.......... <- row 0, is the topmost lane

column 0, is the leftmost segment

=Vehicles=

In this version, there is just 1 vehicle type: all vehicles get to move 1 step to the right in each time step.

=Movement, Priorities & Arrivals=

The simulation is executed in discrete time steps. Each step consists of 2 phases:

1) the movement phase, and

2) the arrival phase.

In the movement phase, all the vehicles that are already on the highway get to move. They do not move synchronous, but one after

another: vehicles that entered the simulation first get to move first.

After all vehicles already on the board have been given the opportunity to move, new vehicles can arrive. These are read from a

list that serves as the program input.

=Detailed 1 lane Example=

Here we provide a detailed example of how the simulation should be executed. Suppose this is the input:

38 0

Then the following simulation should occur:

(Note, the line after the indicated time step shows the state at the beginning of that time step. So, the first car arrives

in the arrival phase of timestep t=2 and therefore is shown at the beginning of time step t=3)

t=0

..................................................

t=1

..................................................

t=2

..................................................

t=3

1.................................................

t=4

.1................................................

t=5

..1...............................................

t=6

1..1..............................................

t=7

.1..1.............................................

t=8

..1..1............................................

t=9

...1..1...........................................

t=10

1...1..1..........................................

t=11

.1...1..1.........................................

t=12

1.1...1..1........................................

t=13

.1.1...1..1.......................................

t=14

..1.1...1..1......................................

t=15

1..1.1...1..1.....................................

t=16

.1..1.1...1..1....................................

t=17

..1..1.1...1..1...................................

t=18

...1..1.1...1..1..................................

t=19

....1..1.1...1..1.................................

t=20

.....1..1.1...1..1................................

t=21

1.....1..1.1...1..1...............................

t=22

11.....1..1.1...1..1..............................

t=23

111.....1..1.1...1..1.............................

t=24

1111.....1..1.1...1..1............................

t=25

11111.....1..1.1...1..1...........................

t=26

111111.....1..1.1...1..1..........................

t=27

1111111.....1..1.1...1..1.........................

t=28

.1111111.....1..1.1...1..1........................

t=29

1.1111111.....1..1.1...1..1.......................

t=30

.1.1111111.....1..1.1...1..1......................

t=31

1.1.1111111.....1..1.1...1..1.....................

t=32

.1.1.1111111.....1..1.1...1..1....................

t=33

1.1.1.1111111.....1..1.1...1..1...................

t=34

.1.1.1.1111111.....1..1.1...1..1..................

t=35

1.1.1.1.1111111.....1..1.1...1..1.................

t=36

.1.1.1.1.1111111.....1..1.1...1..1................

t=37

1.1.1.1.1.1111111.....1..1.1...1..1...............

t=38

.1.1.1.1.1.1111111.....1..1.1...1..1..............

t=39

1.1.1.1.1.1.1111111.....1..1.1...1..1.............

t=40

.1.1.1.1.1.1.1111111.....1..1.1...1..1............

As such, the requested output in this case would be:

.1.1.1.1.1.1.1111111.....1..1.1...1..1............

Input

First a row with 3 integers:

number_of_rows number_of_colums number_of_timesteps

that specify the size of the highway and the number of steps to simulate.

This is followed by the aforementioned list of arrivals. Each entry is a row with 2 integers:

arrival_time row_index

-These rows will be ordered based on arrival time.

Output

The state of the highway after number_of_timesteps have been simulated, encoded as follows:

'.' denotes empty space

'1' denotes a vehicle

Sample Input

Sample Output


版权所有:留学生编程辅导网 2020 All Rights Reserved 联系方式:QQ:99515681 微信:codinghelp 电子信箱:99515681@qq.com
免责声明:本站部分内容从网络整理而来,只供参考!如有版权问题可联系本站删除。 站长地图

python代写
微信客服:codinghelp